The project involved the fusion of 18” and 22” HDPE pipes for red water treatment at the Port de Québec.
Tio Iron and Titanium Mine
The project involved the fusion of 12″ HDPE DR7 pipes (2.5km), in horizontal and vertical position, to extract water from a surface mine.
Mine Niobec
The project involved the installation of 20 km of HDPE pipe (20″ to 30″).